Case

Shetland Heat Energy & Power

The result

Reduced cleaning time

At Lerwick Energy Recovery Plant, after installation of the Aerovit SC-Jet Shower Cleaning solution, time spent on cleaning was reduced from 15 hours to 30 minutes.

Improved work safety

With the implementation of Aerovit SC-Jet hower Cleaning, the work at the plant has
become much safer.

Improvements in the negative pressure in the system

There have been impressive improvements in the negative pressure in the system and it is not choked up like before.

Overview

The Lerwick Energy Recovery Plant is placed on the Shetland Islands and provides heat to the Lerwick District heating network. At the Energy Recovery Plant, the fuel used is a mix of combustible household and industrial waste which cannot be recycled.

The waste-to-energy boiler is a 7 MW boiler which were brought into operation in 1999.

Want a PDF version?

Download the case story

Discover how we helped Shetland Heat Energy & Power to reduce time spent on cleaning and improve system pressure.