Case

+66 days runtime and manual cleaning eliminated

The Results

Extended boiler operation

With the Aerovit system, the boilers could operate continuously for the entire production season (15 February 2023 – 6 May 2023) without the need for manual cleaning. This extended operation period from a maximum of 14 days to 80 days

Enhanced Efficiency

The system maintained the flue gas exit temperature at an average of 90-100°C, significantly lower than the previous 250-300°C. This indicated improved heat transfer efficiency.

Improved Cleanliness

Post-season inspections revealed that the boiler tubes and fireboxes were very clean with no significant deposits. This confirmed the effectiveness of the Aerovit system in preventing fouling.

Elimination of manual cleaning

The Aerovit ShockClean System eliminated the need for manual cleaning, reducing labor intensity and improving HSE conditions for plant personel.

Increased production continuity

By ensuring the boilers remained clean and operational, KP-Agro could maintain a continuous supply of hot water for the drying process, thereby enhancing overall production efficiency and reliability.

Overview

KP-Agro is one of the largest corn seed processing plants in central and northeastern Thailand. The plant is responsible for the preparation of corn seeds, which involves removing corn kernels from the husk and drying them. This process is crucial for maintaining the quality and viability of the seeds for future planting.

Want to know more?

Download case

If you want further information about the case you can find it here